Forward Deployed

The right
systems
at speed

LATCH. The signer-ready acquisition system, fielded with military customers.

Explore LATCH →

Product

LATCH

Signer-Ready Acquisition System

Signed in an afternoon.
Defensible for years.

A $1.2 billion engine buy is one signature away. The memo says buy the hybrid. It goes the farthest. It also breaks down twice as often as allowed, and costs more than budget. LATCH shows you that before your name goes on it, signs the engine that passes, and tells you when that changes.

Friday, 1900. One signature from a $1.2B engine buy.

Acquisition

From the engineer to the warfighter

01

LOCK

A messy trade becomes a locked schema. The engineer locks it; agents do the work; the engine scores.

System

How the agentic system works

>
01Prompt

The decision engineer states the trade in plain language.

The artifact

What the program manager signs

Synthetic
SYNTHETIC · NOT CUI · NOTIONAL DATA
DEPARTMENT OF THE ARMY
Program Executive Office, Ground Vehicle Systems (notional)
Project Manager, Ground Vehicle Block Upgrade (notional)
Building 0000, Notional Arsenal, MI 00000-0000
SFAE-GVS-BU (70-1a)
16 September 2026

MEMORANDUM FOR Program Manager, Ground Vehicle Block Upgrade (SFAE-GVS-BU) (R. Lindqvist)

SUBJECT: (U) Propulsion Decision for Ground Vehicle Block Upgrade (DP-GV-001), Version 1

SYNTHETIC EXEMPLAR. This memorandum is a notional demonstration artifact. The vendors, figures, names, dates, and office symbols are invented. It contains no Government data and is not controlled.

1. (U) References.
  1. Topic ARM26BX06-NV012, Agentic-AI, Schema-Driven Decision Management for Auditable Studies and Acquisition Decisions.
  2. FAR 15.308, Source selection decision.
  3. AFARS 5115.308, Source selection decision document.
  4. Locked decision schema v1, package/schema.json, locked by J. Okafor at 14:01:18.
  5. SysML 2.0 requirement model, models/propulsion.sysml (REQ-R-600, REQ-C-800, REQ-M-2000, REQ-W-2400).
  6. Source corpus: sources/HE-900.spec.md; sources/D-600.spec.md; sources/T-450.spec.md.
2. (U) Purpose. To obtain a decision on the propulsion alternative for the ground vehicle block upgrade (point trade; version 1 of a refreshable decision package). The schema was locked by the decision engineer before scoring. The large language model did not rank options.
3. (U) Recommendation. That the Program Manager select D-600 diesel as the propulsion alternative. D-600 is the only option that satisfies every hard constraint (C1–C4). HE-900 is eliminated on C2 and C3; T-450 on C1, C2, C3. Deterministic score against the locked schema: D-600 0.40 (sole survivor; eliminated options receive no weighted value). Decision readiness: READY FOR SIGN-OFF.
✓APPROVEDDISAPPROVEDSEE ME
R. Lindqvist
Signature of R. Lindqvist, Program Manager (program manager)
16 September 2026
Date
Signed on D-600 at 14:01:38.
4. (U) Discussion.
a. (U) Background. The block upgrade requires a propulsion down-select. This package is a point trade with a defined refresh cycle: when evidence or assumptions change, the locked schema is re-run and a new version is issued. Weights apply only to options that pass every hard constraint.
b. (U) Alternatives considered. COA 1 HE-900 hybrid-electric (eliminated on C2, C3). COA 2 D-600 diesel baseline (recommended; sole feasible option). COA 3 T-450 turbine (eliminated on C1, C2, C3).
c. (U) Evaluation schema (locked by decision engineer; no evaluation while unlocked). Hard constraints: C1 Range ≥ 600 km (REQ-R-600, propulsion.sysml:6); C2 Unit cost ≤ $800k (REQ-C-800, propulsion.sysml:14); C3 MTBF ≥ 2,000 h (REQ-M-2000, propulsion.sysml:10); C4 Mass ≤ 2,400 kg (REQ-W-2400, propulsion.sysml:18). Objective weights on survivors: Range 0.35, Maintainability 0.30, Unit cost 0.20, Mass 0.15.
SYNTHETIC EXEMPLAR
Designation: SYNTHETIC EXEMPLAR. Not CUI. Not a Government record.
This document is a synthetic exemplar produced for demonstration. Vendors, numbers, names, and office symbols are invented.
It contains no Government data, no vendor data, and no controlled technical information.
POC: J. Okafor, decision engineer, SFAE-GVS-BU-E, DSN 000-0000 (synthetic)
SYNTHETIC · NOT CUI · NOTIONAL DATA
DP-GV-001 · v1 · Page 1 of 2
SYNTHETIC · NOT CUI · NOTIONAL DATA
SFAE-GVS-BU
SUBJECT: (U) Propulsion Decision for Ground Vehicle Block Upgrade (DP-GV-001), Version 1
4. (U) Discussion (continued).
d. (U) Hard-constraint gate (pass / fail before any weight). Every reading carries a file and line in the source corpus.
OptionC1 Range
≥ 600 km
C2 Unit cost
≤ $800k
C3 MTBF
≥ 2,000 h
C4 Mass
≤ 2,400 kg
Result
HE-900✓ 720 km
HE-900.spec.md:7
✕ $840k
HE-900.spec.md:9
✕ 1,650 h
HE-900.spec.md:8
✓ 2,310 kg
HE-900.spec.md:10
ELIMINATED on C2, C3
D-600✓ 640 km
D-600.spec.md:7
✓ $610k
D-600.spec.md:9
✓ 2,400 h
D-600.spec.md:8
✓ 1,980 kg
D-600.spec.md:10
FEASIBLE
T-450✕ 510 km
T-450.spec.md:7
✕ $920k
T-450.spec.md:9
✕ 1,100 h
T-450.spec.md:8
✓ 1,740 kg
T-450.spec.md:10
ELIMINATED on C1, C2, C3
e. (U) Comparative assessment (FAR 15.308). Deterministic utility against the locked schema, survivors only. The large language model is not in scoring (llm_in_scoring=false).
OptionScoreRange (0.35)Maintainability (0.30)Unit cost (0.20)Mass (0.15)
D-6000.40u=0.20 · 640 km
D-600.spec.md:7
u=0.40 · 2,400 h
D-600.spec.md:8
u=0.63 · $610k
D-600.spec.md:9
u=0.53 · 1,980 kg
D-600.spec.md:10
HE-900, T-450: no weighted value.
f. (U) HE-900 feasibility boundary (flip-set).
  • ✕ C2 Unit cost ≤ $800k: reads $840k (-40) HE-900.spec.md:9
  • ✕ C3 MTBF ≥ 2,000 h: reads 1,650 h (-350) HE-900.spec.md:8
HE-900 enters the feasible set only when both hold. Range (C1) and mass (C4) already pass. No weight moves this boundary: maintainability was probed at 0.10 and HE-900 remained eliminated. Re-entry otherwise requires a recorded waiver, which was declined.
g. (U) First-class schema objects.
ClassRecordStatus
ConstraintsC1 REQ-R-600; C2 REQ-C-800; C3 REQ-M-2000; C4 REQ-W-2400hard · locked
ObjectivesRange 0.35; Maintainability 0.30; Unit cost 0.20; Mass 0.15locked · survivors only
Bias checksB1 range vs sustainment (opened by agent; agent request to clear denied)cleared by J. Okafor
WaiversWaiver on REQ-M-2000 and REQ-C-800 for HE-900 offered; declined by J. Okafornone recorded
h. (U) Human lock and evaluation method. Schema v1 UNLOCKED until J. Okafor set maintainability 0.30 and cost 0.20 and locked at 14:01:18. Scoring request before lock was DENIED. Agent request to clear B1 was DENIED; B1 cleared by J. Okafor. Deterministic core only after lock.
i. (U) Provenance. Engineer prompt → source read → SysML parse (stopped once on models/propulsion.sysml, fixed by a person) → agent draft (not scored) → human lock → hard-constraint gate → objectives on survivors → boundary → readiness READY FOR SIGN-OFF → this memorandum. Reproducible against schema.json and the source corpus in reference 1f.
5. (U) Impacts.
  1. Personnel. None.
  2. Equipment. D-600 diesel baseline. Export status clear; dual-source supply (D-600.spec.md).
  3. Funding. Recurring unit cost $610k against the $800k ceiling (REQ-C-800); no waiver required.
  4. Schedule. No schedule impact recorded in this package.
6. (U) Coordination. Completed before submission. No unresolved nonconcurrence.
OfficePositionStatusDateRemarks
SFAE-GVS-BU-EDecision engineer (J. Okafor)Prepared16 September 2026Schema lock 14:01:18; B1 cleared; waiver declined
SFAE-GVS-BUProgram manager (R. Lindqvist)SIGNED16 September 2026D-600 · 14:01:38
7. (U) Point of contact. J. Okafor, decision engineer, SFAE-GVS-BU-E, DSN 000-0000 (synthetic).
Encls
  1. 1. Locked decision schema v1 (schema.json)
  2. 2. Hard-constraint gate and survivor scores
  3. 3. HE-900 feasibility boundary
  4. 4. Lineage / provenance record
CF:
SFAE-GVS-BU
J. OKAFOR
Decision Engineer
Originator; schema lock
SYNTHETIC · NOT CUI · NOTIONAL DATA
DP-GV-001 · v1 · Page 2 of 2